60,000-sf phased data hall addition to the CHI02 data center. Phase 1 consists of approximately 20,000-sf of white space on 36โ raised access flooring. Day 1 capacity is 3MW, with an additional future phase to increase to 6MW. The electrical yard consists of (4) 1750 kW generators; (4) EMODs, and (13) gear / transformer units with concrete slab-on-grade. A new dunnage steel platform installed on the roof includes a screen wall to enclose HVAC cooling equipment.
(8) 500KVA PDUs
(13) 42T CRAC units
(48) RPPS for day 1 capacity
EdgeConneX – CHI02 Data Center Hall Addition Read More ยป
28 MW data center
100,000 sf of structural accessible ceiling
EdgeConneX – Hyperscale Data Center Read More ยป
783,000-sf corporate headquarters includes internal communicating stair; full-service kitchen and dining facility; auditorium; fitness center; sound studio; conference center; typical open office floors; and an executive wing with private offices and a boardroom.
11-story project with
fast-track schedule
Completed concurrently
with core-and-shell work
Zero recorded injuries
Zurich North America – Headquarters Relocation Read More ยป
Concreate reaction floor in structural lab included 200 tons of reinforcing steel
04 – Wiss, Janney, Elstner Associates, Inc. – HQ Addition and Janney Technical Center Read More ยป
310,000-sf office consolidation includes the buildout of four floors with branded reception area; client facing spaces;ย private and open-office spaces;ย a Grand Hall; conference rooms; full kitchen, servery, and cafeteria; and a communicating stair.
Amenity spaces feature multi-purpose spaces, game room, library, fitness center, and an outdoor terrace.
Achieved LEED Gold and WELL Platinum certifications
High-end AV elements
Located in Chicago’s
Old Main Post Office
17 – Confidential Logistics Firm – Chicago Talent Hub Read More ยป
14 – Turano Baking Company – Headquarters Relocation Read More ยป
Construction of a new synthetic turf field for soccer and lacrosse; collegiate-level eight-lane running track with both long- and triple-jump lanes / sand pits; new Musco stadium lighting; five new tennis courts; 1,000-seat bleachers with press box and PA system; and a new concession building.
Bleacher seating allows
for capacity up to 886 fans
Included 92,000 sf
of synthetic turf
02 – Timothy Christian Schools – Track and Field Complex Read More ยป
11 – Timothy Christian Schools – High School Addition and Renovation Read More ยป
50,000-sf new middle school, and high-school athletic arena building. Project highlights include classrooms, science lab, lobby and cafeteria, and new athletic arena for the high school. The project also includes sitework revisions, parking lot improvements, and a new bus turnaround drive.
Building enclosure is architectural precast
with brick in-lay, and
glass storefront
State-of-the-art classrooms
Timothy Christian Schools – Middle School and High School Gym Read More ยป