INAP

DAL06 Phase 3 Data Center Expansion

Dallas, TX

Buildout of a 20,000-sf data center expansion includes (2) new electrical rooms; (2) 3000A transformers; (2) 3000A switch gear; (1) 2.5 MW generator; (2) 1200 KW UPSs; (2) 2000A maintenance bypass cabinets; (1) 2000A distribution board; (8) 400A ATSs; and (8) 300 KVA PDUs.

Addition of a 500-ton chiller and (16) CRAH units

Integrated controls and updated the SOO programming

3-foot raised access floor and a day-one mechanical / electrical infrastructure that allows forĀ  tenant expansion