Industrial

CONFIDENTIAL FOOD SCIENCE COMPANY

Construction of three (3) new blender rooms with associated support rooms: tasting room, restrooms, dust collection, and gowning. Construction consists of opening the existing roof, building new penthouse, mezzanine and slab on grade structures with all new extensive MEP systems, structural steel, and IMP wall panels.

 

MÉRIEUX NUTRISCIENCE

71,500-sf single story load bearing precast structure located on approximately a 12-acre site. The new facility includes general office space (approximately ten percent of the overall square footage), a food science center with a pilot plant, and a laboratory with separate microbiology and chemistry functions. The building structure, envelope, interior finishes, and site work was included in the scope of this project.

 

SAINT GOBAIN CONTAINERS

Installation of new site utilities, concrete foundations and mechanical /electrical systems for emissions abatement equipment. Deep foundations (mirco piles) with piers; a new utility building with electrical infrastructure to support a new generator; and miscellaneous MEP work, along with a tepid water system was included. Work was completed to support abatement equipment supplied and installed by others.