Technology

ACTIVECAMPAIGN

52,000-sf tenant buildout of the 5th floor at 1 North Dearborn consists of offices with glass fronts; open office workstations; meeting rooms named with comic book themes; collaborations spaces; café and servery with exposed wood timbers; and reception area.

 

Executive Construction returned to buildout the 4th floor to support ActiveCampaign’s growing Chicago staff. The expanded space of 52,000 sf features new offices with glass fronts; new interconnecting stair; live moss walls; reception area with decorative metal ceiling; break café room with exposed wood timbers; and painted open ceilings. Additional features include new lighting, VAVs, FPBs, new carpeting over an existing raised floor, and a decorative concrete floor finish.

 

SYNGENTA

21,000-sf demolition and tenant buildout features executive offices, open office environment, conference rooms, customer experience area, and café. The scope includes upgraded flooring finishes, millwork, NanaWall operable partition, window treatments, pendant lighting, white noise machines, and AV systems.

 

CISCO SYSTEMS – LEHI, UT

30,000-sf tenant buildout in a first-generation space includes custom wood slat ceilings; wall panels; specialty ceiling systems; and demountable office fronts. This space also features exposed concrete floors; exposed / painted MEP systems; custom acoustic wall panels; and sound masking.