Oakbrook Terrace, IL
Removal and replacement of curtain walls in the ‘center link’ between the two towers required the installation of exterior temporary walls in both areas. Additionally, it required interior temporary drywall partitions and protection enclosures as necessary.
Installed temporary walls around enitre perimeter during construction
Work was performed in an active main lobby of this Class A building