Northlake, IL
10,000-sf of white space within an enterprise data center on a 48” raised floor includes a 2MW critical power configuration fed from a dedicated 1348V substation with OH Starline busway system. Complex design-build systems include mechanical, BAS, fire protection / VESDA detection, electrical, low voltage, and security.


(3) 2MW diesel generators


(6) 750Kva UPS systems


900 tons of chilled
water cooling reflect
critical systems