element critical / skybox datacenters

data halls 5 & 6 expansion

Houston, TX

33,000-sf core and shell addition to an existing data center facility that adds two new 3MW data suites. This includes demolition operations; installation of tilt-wall additions with composite steel; and a poured-in-place concrete roof slab deck. Sitework consists of a small detention pond; removal of an existing storm line; installation of two separate 12” storm lines for roof drainage; and landscaping of perimeter areas of the new addition.

Multi-phased project

Two new 3MW data suites

Roof covered with
PVC roofing system