Ashburn, VA
Phase I includes a 6,000-sf masonry storefront entry infill building with 18-foot exposed deck ceilings connecting the existing data center to the future expansion and serving as the new customer entrance and a Network Operations Center. Phase II consists of 6,000-sf data center expansion, including modified CHWS+R loop and power distribution. Phase III featured 27,000-sf data center, including (1) 35 KV medium voltage switch and (2) 3000 A SWBRDS.
(2) 300-ton chillers
(3) 2MW gas generators
(4) 750 KVA UPSs